Comprehensive implementation from preparation to construction of the PV power plant
The Greenbuddies team is responsible for the implementation of the project, from preparatory and earthworks, through the installation of structures and panels, electrical installations, to technical supervision, project support, and construction management. Completion of construction is planned for the end of 2025, when the power plant should also become fully operational.
PV panels are installed in a two-row arrangement on 28 hectares of agricultural land, placed on advanced tracker structures that follow the movement of the sun across the sky. This system increases production efficiency by up to 30% compared to static installations. Wheat will be grown under the panels, proving that combining agriculture and energy is not only possible but also highly effective.
The estimated annual production of the Triticum project is 22 GWh of electricity, which corresponds to the consumption of approximately 6,000 households. Tracker technology is proving to be the ideal choice for agrivoltaic projects, as its movable structure allows for even sunlight exposure of crops under the panels while increasing energy yield by up to 30%.
The Greenbuddies team has also implemented a similar agrivoltaic park with a capacity of 5.6 MWp in Sweden near the town of Hova, where wheat and rapeseed are grown under solar panels. The first harvest took place there in 2025.