Inverters: 40
PV modules: 22 974
DC cables: 150 km
GreenBuddies

Inverters: 40
PV modules: 22 974
DC cables: 150 km
Installation of mounting system, photovoltaic modules and electrical installation of DC and AC cables. Ramming of 8 631 piles.
The Greenbuddies team handled the comprehensive execution of mechanical and electrical work on a ground-mounted photovoltaic power plant. The scope of work included driving piles, complete assembly of the support structure, and the subsequent installation of photovoltaic modules and inverters. The project also included DC and AC cabling, connecting the transformer on the low-voltage side, laying data cables, excavation work, grounding, and waste management. Greenbuddies also provided the necessary machinery, comprehensive site and project management, and coordination of the individual construction phases.
The scope of work further included reviewing the design and technical documentation, accepting materials at the construction site, and ensuring that the project was carried out in accordance with the project requirements. All work was performed in compliance with the relevant local and European regulations regarding occupational safety, construction, and electrical installations. The project also included providing the necessary hand tools, transportation, and accommodations for the construction teams.