The Greenbuddies team carried out mechanical and related installation work on a ground-mounted photovoltaic power plant in Belgium. The scope of work included unloading, handling, and distributing materials throughout the construction site, preparing foundation sites for the structure, and assisting with pile driving. This was followed by the complete assembly of the support system and the installation of photovoltaic modules in accordance with the project documentation and technical requirements.
The project also included the cabling of the photovoltaic modules, inspection and treatment of individual structural components, and other related assembly work. Greenbuddies also managed on-site operations, material handling, and ongoing waste management—including the collection, sorting, and transport of packaging and other waste materials to designated locations.