During the construction, we faced long DC string routes (the longest single string route is 400 m), in addition, the PV panels were placed on the roofs of variously tall production halls (building heights of 15 to 35 m). The cables were routed through 2 cable trays connecting the production halls - the work was carried out from forklifts and took place over a period of almost 9 months (from May 2021 to January 2022), as the roof cladding was being renovated at the same time.
Genk
Belgium
Roof projects
Photovoltaics
4.9 MWp
Challenges
Goals
The result will be 7300 tonnes of CO2 emissions avoided, equivalent to the emissions of 5900 average households.
Greenbuddies has been involved in a multi-rooftop PV plant with a total capacity of 23 MWp, specifically in the Belgian city of Genk with a capacity of 4860 kWp.