The scope of work included the complete mechanical installation of the photovoltaic system, including the unloading and distribution of the mounting structure and photovoltaic modules on the construction site. The team handled the assembly of the support structure, designed for a south-facing configuration with four modules mounted vertically on each mounting frame.
The project also included the installation of 400 Wp photovoltaic modules in accordance with the manufacturer’s technical requirements and installation instructions. The scope of work did not include assistance with pile driving; however, it built upon the structure’s already prepared foundations. The installed posts were treated with zinc-based paint supplied by the manufacturer at the required locations to maintain their corrosion protection.
At the same time, the team ensured ongoing cleanup of the construction site, collecting packaging and installation materials, sorting them, and consolidating them at designated locations within the individual project sections. Waste material was subsequently placed in containers provided by the client.