Inverters: central
PV Modules: 19 228
DC Cables: 70 km
GreenBuddies

Inverters: central
PV Modules: 19 228
DC Cables: 70 km
Installation of mounting system, photovoltaic modules, and electrical installation of DC cabling. Ramming.
The Greenbuddies team carried out the mechanical and electrical works for a ground-mounted photovoltaic power station. The scope of work included site preparation, pile driving, assembly of the supporting structure, and installation of the photovoltaic modules and inverters. The project also included DC and AC electrical installation work, comprising cabling, the connection of technical equipment and the earthing of the photovoltaic system. Greenbuddies also provided the necessary machinery, handled material handling and coordinated the various activities on site.
The scope of supply also included checking the design and technical documentation, taking delivery of materials on site, and carrying out measurements and compiling as-built documentation. All work was carried out in accordance with the project requirements and the relevant local and European regulations. Greenbuddies also managed waste disposal, provided the necessary hand tools, organised transport and coordinated the implementation team.